top of page

LAKELAND
Settlement Timeline:
30 days
Recovered Amount:
$27,500
Cause of Loss:
Hurricane
Summary:
Following Hurricane Milton, the client faced significant roof damage, including missing, lifted, and torn shingles. Elevated attic humidity and fallen insulation further signaled compromised roof integrity. a PREVIOUS PUBLIC ADJUSTER HAD FILED A CLAIM BUT WAS ONLY ABLE TO RECOVER $2,000 BEFORE LETTING THE CLAIM FALL THROUGH THE CRACKS. Atlas TOOK OVER THE CLAIM AND WAS ABLE TO deliver a settlement sufficient to fully restore the home, with zero extra out-of-pocket costs aside from the deductible.
bottom of page
%20(1).png)


